Dell Lifecycle Controller 1.5 Manuale Utente Pagina 8

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
  • Pagina
    / 13
  • Indice
  • SEGNALIBRI
  • Valutato. / 5. Basato su recensioni clienti
Vedere la pagina 7
8 Scripting WSMAN Operating System Deployment Boot Network ISO
Enter share type: 0
Specify NFS required information.
Enter IP address: [iDRAC IP]
Enter image name (ex: iso.img): [IMAGE NAME]
Enter share name (ex: /home/share): [SHARE NAME]
Boot in progress. Waiting for response. Response received.
A job is created.
Retrieve job status in progress. Waiting for response. Response received.
Job is in state "Rebooting to ISO".
Select choice 3 to monitor job status.
The main menu is returned at the end of the operation.
Detach Network ISO image from one-time boot
This capability is used to detach the Emulated USB device from the target iDRAC’s host, attached
previously using option 1. Option 2 from the main menu, ‘Detach Network ISO from option
1’ allows usage of this capability.
Enter option 1-9: 2
Sample output of the response:
Detach in progress. Waiting for response. Response received.
ISO image has been detached successfully.
The main menu is returned at the end of the operation. The Emulated USB containing the ISO image
is detached.
Vedere la pagina 7
1 2 3 4 5 6 7 8 9 10 11 12 13

Commenti su questo manuale

Nessun commento